The install of two 20,000 hp electric motor driven compressors, ancillary equipment, structural steel, electrical systems, all piping from the main suction and discharge headers, main-line block valve assembly and pipeline installation. The site also included a new compressor building, office warehouse, power building, fuel gas building, air compressor building, drum storage building, gas coolers, oil coolers, blowdowns, inlet scrubbers, storage tanks, communication tower.